Well this week was Awesome! wanna know why... I'll tell you...

So on Monday I worked on those rider plans for council and carried on updating those plans with their new bathroom layouts.. and this carried on until Tuesday when finally completed updating the plans.
On Wednesday... I went on my first site visit since i started working here!! I really enjoyed because not only is it the house that I've been working on the most, but the house is amazing!! It's a three-storey house in Fresnaye and I love it! haha... It's one thing working on drawings for a project, but seeing it in reality is just way better.. the construction started last year in August and they are quite far in the construction process.
I'll add some pics to show you..
Yesterday I finally completed those rider plans, printed four sets and had to colour in all the new changes...and that took time! but I still enjoyed it because these are all things that I can learn from, and i believe that the best way to learn something is to experience it yourself rather through your own eyes than someone else's.
Today the rider plans will be taken in to council and then i'm ready for some more work!!

This is inside garage 1 with a view of the mezzanine level above



The staircase in garage 1 leading up to the mezzanine level


This is a view of the mezzanine level in garage 1


Here is the passage/ walkway into garage 2 on the right


This is in garage two which has space for four cars. You can also see the walkway that leads to the foyer and garage 1 if you turn left.
The staircase leads to a mezzanine level.


This is a closer look at the stair construction


Here is a view of the mezzanine level in garage 2


An opening for the door frame and frame furniture is provided


This is an opening in a htick wall which is the electrical duct


The walkway into the foyer


Thsi is the lift shaft which is situated in the foyer


A view down the life shaft... scary!


This is an opening for where the garage door components will be installed


These are expansion joints in the floor slab to prevent cracks caused by ground movement


Here you can see the joints in the wall where the slab and upstand beam is situated on the other side in garage 1


This is the slab in garage 1


This is an opening in the wall for electrical plug points


This opening is for a pond that will be located there.


A view inside the foyer


Here is the piping and RC beams supporting the floor above


An opening in the ceiling for downlights


This is a view going up the staircase in garage 1 into the mezzanine level


A look into the mezzanine space